Permit Assistance

Septic Permits in Amarillo, TX

Navigating septic system permits can be confusing. In Texas, all on-site sewage facilities (OSSFs) are regulated by the Texas Commission on Environmental Quality (TCEQ), with local authorized agents handling permits at the county level.

At Amarillo Septic Services, we help homeowners and builders understand the permit requirements and guide you through the process. As TCEQ-licensed professionals familiar with Potter County and Randall County requirements, we can handle the paperwork while you focus on your project.

Key Authorities

TCEQ

Texas Commission on Environmental Quality sets statewide regulations under 30 TAC Chapter 285.

Local Authorized Agents

Potter County and Randall County handle permit applications and inspections for the Amarillo area.

Specific requirements vary by location. Areas within Amarillo city limits vs. unincorporated county areas may have different processes.

Know the Requirements

When is a Septic Permit Required?

Not every septic project requires a permit, but most significant work does. Here's a general guide.

Permit Required

New System Installation

All new on-site sewage facilities require permits before construction can begin.

Permit Required

System Replacement

Replacing a failed system with a new installation requires a new permit.

Permit Required

Major Repairs

Repairs that alter the system's original design or capacity require permits.

Permit Required

System Expansion

Increasing system capacity (such as adding bedrooms) typically requires permitting.

Usually No Permit

Minor Repairs

Simple component replacements that don't change the system design may not require permits.

Usually No Permit

Routine Maintenance

Regular pumping, inspections, and filter cleaning do not require permits.

When in Doubt, Ask

Permit requirements can be complex, and penalties for unpermitted work can be significant. If you're unsure whether your project needs a permit, contact us or the local authorized agent before starting work.

Regulatory Framework

TCEQ Chapter 285 Requirements

All septic systems in Texas must comply with regulations under 30 TAC Chapter 285. Here are the key requirements you should know.

Licensing Requirements

  • Installers must be licensed by TCEQ
  • Site evaluators must be TCEQ-licensed
  • Different licenses for different system types
  • Maintenance providers may need licenses for certain systems

Minimum Standards

  • Setback distances from wells, property lines, structures
  • Soil depth and composition requirements
  • System sizing based on bedrooms/usage
  • Required inspection points during installation

System Types Regulated

  • Conventional septic systems
  • Aerobic treatment units (ATUs)
  • Alternative systems (mound, drip, etc.)
  • Evapotranspiration systems

Maintenance Requirements

  • Some advanced systems require maintenance contracts
  • Periodic inspections may be mandated
  • Records must be maintained
  • Compliance verification for property sales
The Process

Septic Permit Application Process

From site evaluation to final approval, here's what to expect when obtaining a septic permit in the Amarillo area.

1

Property Survey/Plat

Obtain or verify your property survey showing boundaries, structures, wells, and other relevant features.

2

Site Evaluation

A TCEQ-licensed site evaluator conducts soil testing and percolation tests to determine suitable system options.

3

System Design

Based on site evaluation results, a qualified professional designs a system that meets all TCEQ requirements.

4

Permit Application

Submit completed application with site evaluation, design plans, and required fees to the local authorized agent.

5

Plan Review

The authorized agent reviews all documentation. This may involve questions or requests for modifications.

6

Permit Issuance

Once approved, a construction permit is issued allowing work to proceed.

7

Installation & Inspections

Work is completed by licensed installers with inspections at required stages.

8

Final Approval

After successful final inspection, an installation permit/certificate is issued.

What You'll Need

Required Documentation

A complete permit application requires several documents. We help you gather and prepare everything needed.

Property survey or plat
Site evaluation report
Soil testing results
System design plans
Setback calculations
Application forms
Permit fees
As-built drawings (after installation)
Costs & Timing

Permit Costs and Timeline

Cost Factors

Permit fees vary based on several factors. Contact Potter County or Randall County for current fee schedules.

  • Type of permit (new installation vs. repair)
  • System type and complexity
  • Local jurisdiction
  • Additional services (site evaluation, soil testing)

Timeline Considerations

Processing times vary by jurisdiction workload and application completeness.

  • Complete applications process faster
  • Weather can affect site evaluations
  • Plan ahead for construction schedules
  • Revisions can add time
We Make It Easy

Let Us Handle the Paperwork

Permit applications can be complex and time-consuming. We handle the process for you, from site evaluation through final approval.

Licensed Professionals

TCEQ-licensed site evaluators and installers

Local Knowledge

Familiar with Potter & Randall County requirements

Complete Service

From evaluation through final inspection

Service Areas

Serving the Texas Panhandle

We assist with septic permits throughout a 50-mile radius from Amarillo.

Need Help with Septic Permits?

Whether you're building new, replacing a system, or just have questions about requirements, we're here to help guide you through the permit process.

Request Your Free Estimate

Fill out the form below and we'll get back to you within 24 hours with a detailed estimate.

By submitting this form, you agree to be contacted regarding your estimate request.

Prefer to call? Reach us directly at

(806) XXX-XXXX